Assessment of Stator Winding Insulation. Part 2 – Tests on Inservice Machines
Keywords:
No Keywords.Abstract
This paper presents the test results and analysis made on several machines at site. Case studies are employed to illustrate the usefulness of measurements on the stator windings in service.Downloads
Download data is not yet available.
Metrics
Metrics Loading ...
Downloads
Published
2010-03-31
How to Cite
Nageshwar Rao, B., Mallikarjunappa, K., Keri, C. D., Afzal Ahamed, T. R., Sudhindra, A., & Ramachandra, B. (2010). Assessment of Stator Winding Insulation. Part 2 – Tests on Inservice Machines. Power Research - A Journal of CPRI, 77–85. Retrieved from https://cprijournal.in/index.php/pr/article/view/687
Issue
Section
Articles
References
Simons J S. "Diagnostic testing of high voltage machine insulation", IEE Proceedings, Vol. 127, part B, No. 3, 1980.
Kelen A. "Diagnostics of HV machine insulation from inspection to continuous monitoring", CIGRE Symposium 05-97, Section 10-2, 1987.
Stark K H. " Assessment of the insulation serviceability of Turbo generator stators and of HV bushings", Proceedings A, pp. 71-88, 1962. Readers.