Operational Optimization of Boilers in Coal-Fired Base Load Thermal Power Plants
##plugins.themes.academic_pro.article.main##
Abstract
##plugins.themes.academic_pro.article.details##
References
- http://www.powermin.nic.in/indian electricity scenario/introduction.htm. Source: Central Electricity Authority, New Delhi.
- http://www.cea.nic.in/reports/yearly/thermal perfm review rep/0910/highlights.pdf
- http://www.cea.nic.in/god/opm/Thermal Performance Review/0809/Highlights.pdf
- Andrew Kusiak and Zhe Song. “Combustion effi ciency optimization and virtual testing: A data mining approach”, IEEE, Trans.Ind. Inform., Vol. 2, No. 3, pp. 176–184, August 2006.
- Zhe Song and Andrew Kusiak. “Constraint based control of boiler effi ciency: A data-mining approach”, IEEE, Trans. Ind. Inform., Vol. 3, No. 1, February 2007.
- Andrew Kusiak and Zhe Song. “Clusteringbased performance optimization of the boiler-turbine system”, IEEE, Transactions on Energy Conversion, Vol. 23, No. 2, pp. 651–658, June 2008.
- Kuprianov V I. “Applications of a costbased method of excess air optimization for the improvement of thermal effi ciency and environmental performance of steam Boilers”, Renew Sustainable Energy Rev., Vol. 9, No. 5, pp. 474–498, 2005.
- Kaewboonsong W and Kouprianov V I. “Minimizing fuel and ‘external’ costs for a variable load utility boiler fi ring fuel oil”, Int. Thermal J Sci., Vol. 42, No. 9, pp. 889–895, 2003.
- Kuprianov V I and Tanetsakunvatana V. “Optimization of excess air for the improvement of environmental performance for a 150 MW boiler fi red with thai lignite,” Appl. Energy, Vol. 74, No. 3, pp. 445–453, 2003.
- Siddhartha Bhatt M, Seetharamu S and Rajkumar N. “Operational optimization of coal fi red thermal power plants”, Energy Manager, No. 2, Vol. 03, April–June 2010.
- Siddhartha Bhatt M, Seetharamu S and Rajkumar N. “A methodology for computation of experimental annual station heat rate benchmark”, The Journal of CPRI, Vol. 5, No. 2, September 2009.